Uninterruptible UPS Power Supply System Installation Testing & Commissioning Method Statement

Below document covers the uninterruptible power supply UPS system installation, testing and commissioning method statement. Before starting the UPS installation work, user manual must be thoroughly read and understood. Applicable safety instructions and warnings must be discussed and appropriate measures must be taken. It is strictly recommended that trained service engineer from manufacturer or authorised […]

Uninterruptible UPS Power Supply System Installation Testing & Commissioning Method Statement Read More »

Fan Coil Unit FCU Installation Method Statement

This document defines the methods to ensure that the works to be conducted at site are in compliance with the approved designs and approved material submittals. The scope of this method of statement is installation of FCU at a construction project or a building. Overall the Project Manager is responsible person for the process of

Fan Coil Unit FCU Installation Method Statement Read More »

Waterproofing Method Statement for Concrete Roof Slab

Below is a brief method statement that covers the application of polymer modified bitumen liquid membrane (Sika Products) with cement screed for non-insulated roof slab. The contractor to arrange mixer for cement-sand mortar and all other tools or equipment for waterproofing work where necessary. Below is list of materials that shall be needed for this

Waterproofing Method Statement for Concrete Roof Slab Read More »

Method Statement for Underground Cable Laying

This electrical safework method statement describes the management arrangements and system of work to adopted for the laying cable for the electrical project. Below is necessary tools & equipment for performing the site activities for laying the cable. Cable Rollers Cable Pulling Grip Hand Cable cutter Manual Cable Crimpers Hydraulic Pole Saws Hand shovel Pickaxe

Method Statement for Underground Cable Laying Read More »

Water Booster Pump Installation Specification & Requirements

The purpose of this plumbing method statement is to describe the methodology for installation of booster pumps for cold water and to detail the steps to be taken to meet the HSE requirements specified for the execution of the project activities. HSE Requirements All personnel working at site shall attend HSE induction / awareness training

Water Booster Pump Installation Specification & Requirements Read More »

Piping Installation & Fabrication Method Statement

TABLE OF CONTENTS PURPOSE SCOPE REFERENCES DEFINITIONS RESOURCES RESPONSIBILITIES SEQUNCE OF WORKS QA/QC HSE REQUIMENTS EMERANCY CONTACTS Purpose: The purpose of this methodology is to provide a systematic control and direction for the activity for the installation of piping at a construction site. This method statement provides the expectation to execute work in safe, eco-friendly

Piping Installation & Fabrication Method Statement Read More »