Safety Procedure for Selection, Use and Inspection of Various Types of Safety Harnesses and Belts

Below is a standard procedure that provides direction and assists in the selection, use and inspection of the various types of fall protection/prevention devices that could be used on any construction project site where personnel and assets are at risk from fall from heights. This safety instruction addresses or covers the activities inside the offices […]

Safety Procedure for Selection, Use and Inspection of Various Types of Safety Harnesses and Belts Read More »

Method Statement for Installation of Hot Water Circulation Pump

This plumbing method statement covers the nature and type of work for HOT water circulation pump installation as per site requirements for any kind of construction project. Procedure also covers frequency on which the inspections are to be carried out. All documentary requirements for this installation activity shall be submitted for approval and this shall

Method Statement for Installation of Hot Water Circulation Pump Read More »

AAC Block Method Statement

This method statement to defines the requirements for execution of Autoclaved Aerated Concrete aac block masonry work. The scope of work includes internal and external block walls of the building as per the approved drawings and other contract requirements and project specifications. Main contractor will submit AAC blocks supplier details and sample for the consultant’s

AAC Block Method Statement Read More »

Drainage System Piping Installation Method

Below is precise method statement of the installation of drainage piping system. The procedure can help plumbing engineers to understand how the drainage system piping can be installed easily. PRECAST U-DRAIN 600mm x 600mm Setting out / Pegging for drainage line shall be established by surveyor. Excavation for surface drainage shall be carried out to

Drainage System Piping Installation Method Read More »

Closed Control Unit CCU Air Conditioning Unit Installation Method Statement

This Method Statement covers the Installation of floor mounted Close Control Units CCU with down flow air delivery serving the room. Following this procedure will ensure the CCU installation has been carried out as per contract specifications and manufacturer’s recommendations. The mechanical method statement gives details of how the work will be carried out and

Closed Control Unit CCU Air Conditioning Unit Installation Method Statement Read More »