Download Method Statement For Testing & Commissioning Of Smoke Management System
Download Package Contains the Method Statement + Checklist for Testing & Commissioning + Inspection & Testing Plan + Risk Assessment
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.
Method Statement For Smoke Management System Installation T&C
The files are in Word/Excel formats and instantly available.