Download Method Statement for installation & Testing Of Refrigerant Piping System for packaged units, CCU and FCU etc.
The files are in word/excel format and instantly available you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients.
You shall get following files:
  1. Method Statement
  2. ITP
  3. Installation Checklist
  4. Pressure Test Checklist
  5. Risk Assessment
Below is a snapshot showing the content of the download package for method of statement for INSTALLATION & TESTING OF REFRIGERANT PIPING SYSTEM.