Method Statement For Installation, Testing & Commissioning of Electric Water Heaters.
The files are in Word/Excel formats and instantly available, you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Download package contains:
- Method Statement
- Checklist for Installation & Testing
- Checklist for Commissioning
- Inspection & Testing Plan
- Risk Assessment
Below is the list of files that are included in download package.