Download Method Statement For Installation Of Field Devices for Chiller Plant Manager
Download Package Contains the Method Statement, Checklist for Installation, Inspection & Testing Plan and Risk Assessment.
The files are in Word/Excel formats and instantly available. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.