Download Method Statement For Erection and Maintenance of Tower Crane
Download Package Contains the Method Statement +
Inspection & Testing Plan +
Checklist for Erection +
Daily & Monthly checklists for Routine Inspection
You only need to change project name and
insert logos etc and the same shall be
ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.
The files are in Word/Excel formats and instantly available.