Download Method Statement for
Blinding Concrete Work
Download package contains the Method Statement +
Checklist for Blinding Concrete Installation +
Inspection & Testing Plan +
Risk Assessment
You only need to change project name and
insert logos etc and the same shall be
ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.

The files are in Word/Excel formats and instantly available.