Download Method Statement for Installation of Lightning Protection System Including Earth Pits.
Download package contains:
  1. Method Statement
  2. Checklist for Installation
  3. Earth Pit Test Certificate
  4. Inspection & Testing Plan
  5. Quality Control Procedure QCP
  6. Risk Assessment
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.