Download Method Statement for Installation of Lighting Control System LCS.
The files are in Word/Excel formats and instantly available you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Download package contains:
- Method Statement
- Checklist for Installation
- Inspection & Testing Plan
- Quality Control Procedure QCP
- Risk Assessment
Below is the list of files that are included in download package.
