Download method statement for installation of Grills, Diffusers, Louvers and Disc Valves.
The files are in word/excel format and instantly available after you pay the cost.
Download package contains the Checklist for Installation + Inspection & Testing Plan + Risk Assessment.
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.