Now you can Download Method Statement For Installation of Fire Fighting Pump.
The files are in Word/Excel formats and instantly available, you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Download package contains:
  1. Method Statement
  2. Checklist for Installation
  3. Inspection & Testing Plan ITP
  4. Risk Assessment.
Below is the list of files that are included in download package.