Download Method Statement for Installation, Testing & Commissioning of Fire Fighting Sprinkler System. Fire fighting system installation procedure download package contains:
  1. Method Statement
  2. Checklist for Installation
  3. Checklist for Testing & Commissioning
  4. Hydro Static Test Certificate
  5. Inspection & Testing Plan
  6. Quality Control Procedure QCP
  7. Risk Assessment
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.