Download Method Statement for installation Of LV Power Cables and Wires.  Method statement is for indoor and outdoor applications including underground installation of Cables & Wires, which can be downloaded immediately by paying a very nominal fees.
The files are in word/excel format and instantly available.
Download package contains two checklists, inspection & test plan plus risk assessment.
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients.
Below is the list of files that are included in download package.