Download Method Statement for installation of transformers at a construction project in editable formats.
Download package contains:
  1. Installation Method Statement
  2. Checklist for Transformer Installation
  3. Inspection & Testing Plan
  4. Risk Assessment
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.