Now you can download below mentioned 10 method statements for electrical testing and commissioning.

These method statements are in editable formats with all necessary supporting forms and checklists.

You can check free sample of one electrical method statement and after that decide about downloading the full package.

 

Each method statement folder contains method statement, ITP, Checklists and risk assessment. Additionally you will find quality control procedure for each activity.

1- Testing of Earthing & Lightning Protection System

2- Medium Voltage Power Cables Testing & Commissioning

3- Transformer Testing and Commissioning

4- Bus Duct and Busbar Trunking system Testing & Commissioning

5- Central Battery System Testing & Commissioning

6- MDB, SMDB, DB, MCC & CB Testing and Commissioning

7- UPS System Testing and Commissioning

8- Lighting Control System Testing and Commissioning

9- MV Switchgear Testing & Commissioning

10- Diesel Generator Set Testing & Commissioning

method statement for electrical testing and commissioning