Download Method Statement for drainage piping installation and testing for above and under ground installations.
Download package contains:
- Method Statement,
- ITP,
- Installation Checklist,
- Leak Test Sheet and
- Risk Assessment.
The files are in word/excel format and instantly available, you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients.
Below is a snapshot showing the content of the download package.