Download Method Statement For Installation of Ventilation, Exhaust, Extract & Plume Fans.
 You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients.
The files are in word/excel format and instantly available.
Below is the list of files that are included in download package.