Download Method Statement For Installation & Testing of Domestic Cold and Hot water supply Piping System and Accessories For Above & Below Ground Installations.
Download package contains:
- Method Statement
- Checklist for Under Ground Piping Installation
- Checklist for Above Ground Piping Installation
- Hydro Pressure Test Report
- Inspection & Testing Plan
- Risk Assessment
All files are editable, you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.