Now you can download method statement for cooling towers. Download package contains the method statement, checklist for installation, inspection & testing plan and risk assessment.
You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.