Download Method Statement for Installation & Gravity Testing Of Condensate Drain Piping System. The files are in Word/Excel formats and instantly available, you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Download package contains:
  1. Method Statement
  2. Checklist for Installation
  3. Checklist for Gravity Testing
  4. Inspection & Testing Plan
  5. Quality Control Procedure QCP
  6. Risk Assessment
Below is the list of files that are included in download package.