Download Method Statement for Testing & Commissioning of CCTV Closed Circuit Video Surveillance Camera System.
Download package contains the Method Statement + Checklists for pre commissioning & commissioning + Inspection & Testing Plan + Risk Assessment.
You only need to change project name and
insert logos etc and the same shall be
ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.
The files are in Word/Excel formats and instantly available.