Installation Of Raceways (Cable Tray, Cable Ladder And Cable Trunking) For Electrical Services
Download package contains the Method Statement +
Checklist for Installation +
Inspection & Testing Plan +
Quality Control Procedure QCP +
Risk Assessment
You only need to change project name and
insert logos etc and the same shall be
ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.
The files are in Word/Excel formats and instantly available.