Download Method Statement For Installation of Access Control System ACS.
Download package contains the method statement, Checklist for Installation, Inspection & Testing Plan, Quality Control Procedure QCP and Risk Assessment.
The files are in Word/Excel formats, you only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from consultant/clients.
Below is the list of files that are included in download package.