Plumbing Method Statement

Best Sanitary Installation Method Statement

This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the approved design, drawings and material submittals. Prior to the installation of Sanitary Wares, the supervisor and foreman will verify and ensure that all the health and safety requirements are considered and necessary control measures […]

Best Sanitary Installation Method Statement Read More »

Method Statement for Installation of Hot Water Circulation Pump

This plumbing method statement covers the nature and type of work for HOT water circulation pump installation as per site requirements for any kind of construction project. Procedure also covers frequency on which the inspections are to be carried out. All documentary requirements for this installation activity shall be submitted for approval and this shall

Method Statement for Installation of Hot Water Circulation Pump Read More »

Drainage System Piping Installation Method

Below is precise method statement of the installation of drainage piping system. The procedure can help plumbing engineers to understand how the drainage system piping can be installed easily. PRECAST U-DRAIN 600mm x 600mm Setting out / Pegging for drainage line shall be established by surveyor. Excavation for surface drainage shall be carried out to

Drainage System Piping Installation Method Read More »

Water Booster Pump Installation Specification & Requirements

The purpose of this plumbing method statement is to describe the methodology for installation of booster pumps for cold water and to detail the steps to be taken to meet the HSE requirements specified for the execution of the project activities. HSE Requirements All personnel working at site shall attend HSE induction / awareness training

Water Booster Pump Installation Specification & Requirements Read More »