Mechanical Method Statements

Chilled Water Pipe Pressure Testing Method Statement

Below is a precise method statement covering the chilled water piping hydrostatic pressure testing. Below are general requirements: Prior to water pressure test WIR will be raised as per project requirements for approval of installation of CHW piping work. Inspection request for pressure testing will be raised with piping portion highlighted on drawing plan offered […]

Chilled Water Pipe Pressure Testing Method Statement Read More »

Method of Statement for Installation of Chilled water Piping System CHWP

The purpose of this HVAC mechanical method statement is to outline the methodology to be implemented for chilled water CHW piping system activities and to ensure that all works are carried out in accordance with the approved construction drawings, project specifications and manufacturer installation instructions. Mechanical method statement covers above ground chilled water piping system

Method of Statement for Installation of Chilled water Piping System CHWP Read More »

Compact Desiccant Dehumidifier Testing & Commissioning Method Statement

Below is a precise method statement for the testing and commissioning of the compact desiccant dehumidifier for any kind of project or building. All the installation testing and commissioning works shall comply with: Project Specifications Approved Contract Drawings Technical Contractors Submittals Project Quality Plan Project Safety Plan Testing and Commissioning Plan Manufacturer IOM Manuals Arrange

Compact Desiccant Dehumidifier Testing & Commissioning Method Statement Read More »

Drainage System Piping Installation Method

Below is precise method statement of the installation of drainage piping system. The procedure can help plumbing engineers to understand how the drainage system piping can be installed easily. PRECAST U-DRAIN 600mm x 600mm Setting out / Pegging for drainage line shall be established by surveyor. Excavation for surface drainage shall be carried out to

Drainage System Piping Installation Method Read More »

Closed Control Unit CCU Air Conditioning Unit Installation Method Statement

This Method Statement covers the Installation of floor mounted Close Control Units CCU with down flow air delivery serving the room. Following this procedure will ensure the CCU installation has been carried out as per contract specifications and manufacturer’s recommendations. The mechanical method statement gives details of how the work will be carried out and

Closed Control Unit CCU Air Conditioning Unit Installation Method Statement Read More »

Fan Coil Unit FCU Installation Method Statement

This document defines the methods to ensure that the works to be conducted at site are in compliance with the approved designs and approved material submittals. The scope of this method of statement is installation of FCU at a construction project or a building. Overall the Project Manager is responsible person for the process of

Fan Coil Unit FCU Installation Method Statement Read More »