Electrical Method Statement

Uninterruptible UPS Power Supply System Installation Testing & Commissioning Method Statement

Below document covers the uninterruptible power supply UPS system installation, testing and commissioning method statement. Before starting the UPS installation work, user manual must be thoroughly read and understood. Applicable safety instructions and warnings must be discussed and appropriate measures must be taken. It is strictly recommended that trained service engineer from manufacturer or authorised […]

Uninterruptible UPS Power Supply System Installation Testing & Commissioning Method Statement Read More »

Method Statement for Underground Cable Laying

This electrical safework method statement describes the management arrangements and system of work to adopted for the laying cable for the electrical project. Below is necessary tools & equipment for performing the site activities for laying the cable. Cable Rollers Cable Pulling Grip Hand Cable cutter Manual Cable Crimpers Hydraulic Pole Saws Hand shovel Pickaxe

Method Statement for Underground Cable Laying Read More »

Scroll to Top