Civil Method Statement

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with material obtained from approved borrow areas or suitable material obtained from roadway excavation and drain excavation etc. The embankment construction work shall be preformed in compliance with , contract agreement, Ministry of Road Transport & […]

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base Read More »

Construction Traffic Control Procedure for Project Sites

Below is a standard HSE procedure that describes the general traffic rules for construction site operations. This safety instruction is the minimum standard that is to be adopted on construction project sites for construction traffic control. Client requirements on specific projects may reflect a higher standard to be complied with by the responsible personnel on

Construction Traffic Control Procedure for Project Sites Read More »

AAC Block Method Statement

This method statement to defines the requirements for execution of Autoclaved Aerated Concrete aac block masonry work. The scope of work includes internal and external block walls of the building as per the approved drawings and other contract requirements and project specifications. Main contractor will submit AAC blocks supplier details and sample for the consultant’s

AAC Block Method Statement Read More »

Waterproofing Method Statement for Concrete Roof Slab

Below is a brief method statement that covers the application of polymer modified bitumen liquid membrane (Sika Products) with cement screed for non-insulated roof slab. The contractor to arrange mixer for cement-sand mortar and all other tools or equipment for waterproofing work where necessary. Below is list of materials that shall be needed for this

Waterproofing Method Statement for Concrete Roof Slab Read More »

Scroll to Top