Chilled Water Pipe Pressure Testing Method Statement

Below is a precise method statement covering the chilled water piping hydrostatic pressure testing. Below are general requirements: Prior to water pressure test WIR will be raised as per project requirements for approval of installation of CHW piping work. Inspection request for pressure testing will be raised with piping portion highlighted on drawing plan offered […]

Chilled Water Pipe Pressure Testing Method Statement Read More »

Method of Statement for Installation of Chilled water Piping System CHWP

The purpose of this HVAC mechanical method statement is to outline the methodology to be implemented for chilled water CHW piping system activities and to ensure that all works are carried out in accordance with the approved construction drawings, project specifications and manufacturer installation instructions. Mechanical method statement covers above ground chilled water piping system

Method of Statement for Installation of Chilled water Piping System CHWP Read More »

Compact Desiccant Dehumidifier Testing & Commissioning Method Statement

Below is a precise method statement for the testing and commissioning of the compact desiccant dehumidifier for any kind of project or building. All the installation testing and commissioning works shall comply with: Project Specifications Approved Contract Drawings Technical Contractors Submittals Project Quality Plan Project Safety Plan Testing and Commissioning Plan Manufacturer IOM Manuals Arrange

Compact Desiccant Dehumidifier Testing & Commissioning Method Statement Read More »

Construction Traffic Control Procedure for Project Sites

Below is a standard HSE procedure that describes the general traffic rules for construction site operations. This safety instruction is the minimum standard that is to be adopted on construction project sites for construction traffic control. Client requirements on specific projects may reflect a higher standard to be complied with by the responsible personnel on

Construction Traffic Control Procedure for Project Sites Read More »

Method Statement for Installation of Hot Water Circulation Pump

This plumbing method statement covers the nature and type of work for HOT water circulation pump installation as per site requirements for any kind of construction project. Procedure also covers frequency on which the inspections are to be carried out. All documentary requirements for this installation activity shall be submitted for approval and this shall

Method Statement for Installation of Hot Water Circulation Pump Read More »

AAC Block Method Statement

This method statement to defines the requirements for execution of Autoclaved Aerated Concrete aac block masonry work. The scope of work includes internal and external block walls of the building as per the approved drawings and other contract requirements and project specifications. Main contractor will submit AAC blocks supplier details and sample for the consultant’s

AAC Block Method Statement Read More »

Drainage System Piping Installation Method

Below is precise method statement of the installation of drainage piping system. The procedure can help plumbing engineers to understand how the drainage system piping can be installed easily. PRECAST U-DRAIN 600mm x 600mm Setting out / Pegging for drainage line shall be established by surveyor. Excavation for surface drainage shall be carried out to

Drainage System Piping Installation Method Read More »

Fan Coil Unit FCU Installation Method Statement

This document defines the methods to ensure that the works to be conducted at site are in compliance with the approved designs and approved material submittals. The scope of this method of statement is installation of FCU at a construction project or a building. Overall the Project Manager is responsible person for the process of

Fan Coil Unit FCU Installation Method Statement Read More »