Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base

Below is a precise roadwork method statement that covers construction of embankment including soil stabilization and sub base preparation, with material obtained from approved borrow areas or suitable material obtained from roadway excavation and drain excavation etc. The embankment construction work shall be preformed in compliance with , contract agreement, Ministry of Road Transport & […]

Embankment Construction Method Statement Including Soil Stabilization & Granular Sub Base Read More »

Best Sanitary Installation Method Statement

This document describes best method for the sanitary installation to ensure that the installation works are conducted in compliance with the approved design, drawings and material submittals. Prior to the installation of Sanitary Wares, the supervisor and foreman will verify and ensure that all the health and safety requirements are considered and necessary control measures

Best Sanitary Installation Method Statement Read More »

Chilled Water Pipe Pressure Testing Method Statement

Below is a precise method statement covering the chilled water piping hydrostatic pressure testing. Below are general requirements: Prior to water pressure test WIR will be raised as per project requirements for approval of installation of CHW piping work. Inspection request for pressure testing will be raised with piping portion highlighted on drawing plan offered

Chilled Water Pipe Pressure Testing Method Statement Read More »

Method of Statement for Installation of Chilled water Piping System CHWP

The purpose of this HVAC mechanical method statement is to outline the methodology to be implemented for chilled water CHW piping system activities and to ensure that all works are carried out in accordance with the approved construction drawings, project specifications and manufacturer installation instructions. Mechanical method statement covers above ground chilled water piping system

Method of Statement for Installation of Chilled water Piping System CHWP Read More »

Compact Desiccant Dehumidifier Testing & Commissioning Method Statement

Below is a precise method statement for the testing and commissioning of the compact desiccant dehumidifier for any kind of project or building. All the installation testing and commissioning works shall comply with: Project Specifications Approved Contract Drawings Technical Contractors Submittals Project Quality Plan Project Safety Plan Testing and Commissioning Plan Manufacturer IOM Manuals Arrange

Compact Desiccant Dehumidifier Testing & Commissioning Method Statement Read More »

Construction Traffic Control Procedure for Project Sites

Below is a standard HSE procedure that describes the general traffic rules for construction site operations. This safety instruction is the minimum standard that is to be adopted on construction project sites for construction traffic control. Client requirements on specific projects may reflect a higher standard to be complied with by the responsible personnel on

Construction Traffic Control Procedure for Project Sites Read More »

Scroll to Top